Week 38 Sunday update – almost in control

Leave a comment

The control hut consists of 6 separate parts that you’ve got to try and get together as best you can.

It requires a bit of fettling but it’s mostly done with a little bit of Plastic Putty. I’ve also been cleaning up selected parts but managed to have the screw ping off into the distance which has had to been replaced by something similar from the spares box.

Week 38 Sunday update – almost in control

Leave a comment

The control hut consists of 6 separate parts that you’ve got to try and get together as best you can.

It requires a bit of fettling but it’s mostly done with a little bit of Plastic Putty. I’ve also been cleaning up selected parts but managed to have the screw ping off into the distance which has had to been replaced by something similar from the spares box.

Week 38 Sunday update – almost in control

Leave a comment

The control hut consists of 6 separate parts that you’ve got to try and get together as best you can.

It requires a bit of fettling but it’s mostly done with a little bit of Plastic Putty. I’ve also been cleaning up selected parts but managed to have the screw ping off into the distance which has had to been replaced by something similar from the spares box.

Week 37 Sunday update – it’s some progress

Leave a comment

Just some sanding cutting and a little filling to get these parts ready so far. The two on the bottom still need some work.

Week 36 Sunday update – it’s just a new kit

Leave a comment

One of those weeks where no modelling was done. Got a new kit and that’s about it and finally some birds.

Week 35 – Sunday no Monday update – it’s on my radar

Leave a comment

Mostly did work on my new Brengun 1.144 Wurzberg. As expected with Brengun it’s a nice kit. Have done some clean-up at least.

Work so far
BNA haul above

Below is some paint from my local hobby shop $20 for the lot.