Apart from a 11km walk which was meant to be more like half that the week has consisted of a fair bit of modelling.

The Ki61 is still moving slowly forward with more small bits like the U/C being worked on. The aerial is looking better but will still need to be fitted and fettled when it’s closer to painting time.

The other mine clearer also got a coat of Dunkelgelb via the spray can and needs a little extra coat for a few missed bits.

An attempt was made to do some airbrushing practice but problems with using Xtracrylics has made me switch to Vallejo. Unfortunately even this didn’t work so a switch of airbrushes and a tear down will be needed next week as the mojo had run out yesterday.

Lastly was the skip bin which had a construction surge from one side to all four and some filler added to round out the weekend’s efforts.

Lastly I did order some stuff from BNA including a preorder for the 1.32 Hs 129 I want but who knows when it will arrive.